
CNPV.AI / Engineering
From a site question to a defined package.
A clear review process makes scope, interfaces and evidence visible before a commercial commitment.
Discuss your siteIndustrial concept imagery; not a delivered-project record.
01 / Frame the brief
Describe the company, site, target power, available fuel and operating mode.
Output: a shared list of known conditions, assumptions and missing inputs. Unknown values can stay unknown until the site can supply them.
02 / Map the interfaces
Identify electrical, fuel, civil and controls boundaries across the site and package suppliers.
Output: an interface register and proposed responsibility split. Utility-operator responsibilities and building, IT and cooling scopes remain outside our offer.
03 / Review the evidence
Separate documented product capability from project assumptions and partner-delivered functions.
Output: a review list covering technical evidence, exclusions and questions to resolve. Performance figures require a named evidence source.
04 / Agree acceptance
Define what needs to be inspected, tested and handed over before discussing a final package.
Output: project-specific acceptance criteria, documentation needs and responsibility for commissioning, training and maintenance. Final obligations belong in the agreed contract.