CNPV.AI / Project readiness

Bring the site into focus.

A practical, printable checklist for your internal engineering conversation. Mark items locally, then prepare a company inquiry when ready.

Discuss your site

Industrial concept imagery; not a delivered-project record.

01

Site and operating environment

Company, country or region, site type, access and ambient conditions.

Record whether information is measured, estimated or unknown. Do not include personal addresses or individual contact details.

02

Load and electrical interface

Target MW or unknown, critical-load list, starting behavior and islanded or grid-tied mode.

Collect the available single-line diagram and note any grid-export conditions. Values are requirements, not statements of delivered performance.

03

Fuel and source conditions

Available fuel or gas, current analysis and conditioning needs.

Identify the source, expected variability and ownership of testing. Do not treat assumed fuel properties as confirmed design inputs.

04

Delivery and acceptance

Site schedule, partner responsibilities, documentation and commissioning requirements.

List unresolved interfaces and define the evidence needed to close each item before a package is agreed.

Request a consultation

Tell us site conditions, target MW, fuel/gas availability, and islanded vs grid-tied needs. We respond at company level for export packages.