How to compare generator set quotations
Put competing quotes on a shared technical and commercial basis before ranking their prices.

Freeze the configuration and performance basis
Record the exact engine, alternator, controller and enclosure. Compare net electrical output at the same site conditions, fuel, voltage, frequency and duty rating. Attach the dated datasheet and record each deviation from the request.
Separate equipment price from delivery scope
Confirm who supplies fuel treatment or storage, switchgear, transfer controls, delivery, installation and commissioning. Ask for lead time and delivery terms, applicable documents, warranty start date and exclusions, spares, and what must be witnessed at acceptance.
| Comparison row | Supplier A records | Supplier B records |
|---|---|---|
| Configuration and site output | Models, site rating, datasheet revision | Models, site rating, datasheet revision |
| Supply boundaries | Included items, exclusions, optional prices | Included items, exclusions, optional prices |
| Delivery and handover | Delivery terms, FAT, commissioning, warranty | Delivery terms, FAT, commissioning, warranty |
Next procurement step
Ask each bidder to answer the same comparison sheet and return a separate deviations list.
Technical references
Generator set procurement articles
Diesel vs gas generators for industrial sites
Start with the fuel that can reliably reach the set during the hours it must run. Then compare both packages against the same load profile and operating scenario.
Prime vs standby generator ratings
Select the duty rating from how the set will run, then compare site-rated electrical output under that duty.
What fuel data belongs in a gas generator RFQ?
Identify the gas and its variability at the proposed equipment boundary. A fuel name alone gives the supplier too little information to confirm a configuration.
Generator set factory acceptance test checklist
Write the test sequence, limits and evidence requirements into the purchase documents so the buyer and factory can agree what counts as a pass.
How to specify data center standby generator sets
Start with the power restoration sequence and the loads each set must accept. Use these inputs to review the generator and switchgear interface with the project electrical team.