Prime vs standby generator ratings
Select the duty rating from how the set will run, then compare site-rated electrical output under that duty.

Describe a representative operating cycle
A backup set starts when the normal source fails. A prime-power set may supply a changing load as the main source. If the site expects sustained operation at a steady load, ask for the continuous-duty basis. State annual hours, average and peak loads, and the largest single step.
Normalize the numbers before comparing bids
Ask for the rating definition, allowable hours and average-load limits, plus any overload allowance. Compare electrical kW and kVA at the same power factor, voltage, frequency and site conditions. Ask which auxiliary loads are included when the supplier states usable output.
| Operating pattern | Rating to discuss | Verify in writing |
|---|---|---|
| Normal supply interruption | Standby | Operating restrictions and expected outage pattern |
| Primary source with varying demand | Prime | Permitted average load and overload policy |
| Sustained steady output | Continuous | Output at site conditions and auxiliary loads |
Next procurement step
Attach a daily load profile and expected annual operating hours to the inquiry.
Technical references
Generator set procurement articles
Diesel vs gas generators for industrial sites
Start with the fuel that can reliably reach the set during the hours it must run. Then compare both packages against the same load profile and operating scenario.
What fuel data belongs in a gas generator RFQ?
Identify the gas and its variability at the proposed equipment boundary. A fuel name alone gives the supplier too little information to confirm a configuration.
How to compare generator set quotations
Put competing quotes on a shared technical and commercial basis before ranking their prices.
Generator set factory acceptance test checklist
Write the test sequence, limits and evidence requirements into the purchase documents so the buyer and factory can agree what counts as a pass.
How to specify data center standby generator sets
Start with the power restoration sequence and the loads each set must accept. Use these inputs to review the generator and switchgear interface with the project electrical team.